Museum Guide
Official opening on July 26, 2021
(Renovated on February 26, 2022),
April 2021,
The museum is collaborating with Studio Ghibli first
(Plarail Railway Museum ✕ Studio Ghibli).
In June 2022, the museum will be affected by COVID-19 | Omcron Raid,
Closed disinfection measures are implemented throughout the building,
July 2022,
customer re-opening,
As the museum went through closed disinfection measures,
Visitors fell.
That is why we are now increasing visits to the venue.
Guests, bring a different and new experience!

Map of the Museum


Title Introduction
Chronology
2020.8.1. Earthquake disaster
2020.8. Complex railway system
2020.10. Complex railway system-2
2020.11. Three lines in unison!
2021.2. Spiral tower three-dimensional crossing
2021.4. Messy overhead systems
2021.5. Three-column parallel | Smoothie and inverse
2021.6. Three-line divergence • Huge garage
2021.7.1. Elevated and flat
2021.7.15. Swing circle • Huge control station
2021.7.26. Opening ceremony
2021.8. Double elevated with central station
2021.9.1. Central Slalom Terminal | Swing rail
2021.9.20. Airport Express, Light Rail, Limited Express Express
2021.10. Complex railway systems (replica)
2021.12. Super Three-Dimensional Swing Garage
2022.2.1. Five-wire parallelism
2022.2.26. Renovate the | Opening ceremony
2022.2.27. Disorganized communication system
2022.5.29. Turn right and Turn left | Rendezvous
2022.6.2. Import round-trip tracks
H5 Series Hokkaido Shinkansen
- [Closed] -
2022.7.23. Underground • Flat • Elevated Class 3 stations
Huge garage | new